Multilevel Parking Facility, Ashgabat, Turkmenistan
General Project Information:
The multi-level parking facility in Ashgabat is an infrastructure facility comprising various engineering systems that require a reliable power supply.
The facility’s energy infrastructure includes a 10/0.4 kV, 1,000 kVA transformer substation, providing voltage transformation and distribution of electrical power to the main engineering systems of the parking facility.
Location:
Ashgabat, Turkmenistan
Scope of Work:
The project included the supply, installation, testing, and commissioning of a 10/0.4 kV, 1,000 kVA transformer substation.
Equipment Supply:
- 1,000 kVA power transformer;
- 10 kV and 0.4 kV equipment;
- Power and control cables and necessary installation materials.
Electrical Installation Works:
- Installation of the power transformer and distribution equipment;
- Connection of 10 kV and 0.4 kV equipment;
- Laying and connection of power and control cables;
- Electrical connections and installation of the grounding system.
Testing and Commissioning:
- Testing of the power transformer and installed electrical equipment;
- Inspection of cable and electrical connections and the grounding system;
- Commissioning works;
- Preparation of the transformer substation for operation.