Multilevel Parking Facility, Ashgabat, Turkmenistan



Multilevel Parking Facility, Ashgabat, Turkmenistan

General Project Information:

The multi-level parking facility in Ashgabat is an infrastructure facility comprising various engineering systems that require a reliable power supply.

The facility’s energy infrastructure includes a 10/0.4 kV, 1,000 kVA transformer substation, providing voltage transformation and distribution of electrical power to the main engineering systems of the parking facility.

Location:

Ashgabat, Turkmenistan

Scope of Work:

The project included the supply, installation, testing, and commissioning of a 10/0.4 kV, 1,000 kVA transformer substation.

Equipment Supply:

  • 1,000 kVA power transformer; 
  • 10 kV and 0.4 kV equipment; 
  • Power and control cables and necessary installation materials. 

Electrical Installation Works:

  • Installation of the power transformer and distribution equipment; 
  • Connection of 10 kV and 0.4 kV equipment; 
  • Laying and connection of power and control cables; 
  • Electrical connections and installation of the grounding system. 

Testing and Commissioning:

  • Testing of the power transformer and installed electrical equipment; 
  • Inspection of cable and electrical connections and the grounding system; 
  • Commissioning works; 
  • Preparation of the transformer substation for operation.