General Project Information:
Mary State Power Plant is one of the largest power infrastructure facilities in Turkmenistan and plays an important role in maintaining the stability of the national power system.
As part of the development and modernization of the power plant, works were carried out related to gas turbine units, temporary power supply, and 6/0.4 kV transformer substations.
Location:
Mary, Mary Province, Turkmenistan
Scope of Work:
As part of the project, electrical installation works for the gas turbine units were carried out, temporary power supply was provided, and works related to the 6/0.4 kV transformer substations were performed.
Gas Turbine Units:
- Execution of electrical installation works;
- Connection of electrical and auxiliary equipment;
- Inspection of completed electrical connections and preparation of the equipment for operation.
Temporary Power Supply:
- Provision of temporary power supply for the site;
- Installation and connection of temporary electrical equipment;
- Laying and connection of power cables;
- Provision of power supply to temporary loads.
6/0.4 kV Transformer Substations:
- Works related to three sets of 6/0.4 kV transformer substations;
- Installation of transformer equipment rated at 1×1600 kVA and 2×1000 kVA;
- Completion of electrical connections and preparation of the equipment for operation.