Construction of Cable Lines and Transformer Substations in Yandakly-Agyz Village, Ahal Province, Turkmenistan



Construction of Cable Lines and Transformer Substations in Yandakly-Agyz Village, Ahal Province, Turkmenistan

General Project Information:

A 10/0.4 kV electrical distribution network was established to provide power supply to consumers in Yandakly-Agyz village.

The energy infrastructure includes 19 km of 0.4 kV cable lines, 11 km of 10 kV lines, ten transformer substations rated from 400 to 800 kVA, and a 10 kV distribution center.

Location:

Ahal Province, Turkmenistan

Scope of Work:

The project included civil, electrical installation, and commissioning works for the development of the 10/0.4 kV electrical distribution network.

0.4 kV and 10 kV Distribution Lines:

  • Laying of 0.4 kV cable lines with a total length of 19 km; 
  • Construction and installation of 10 kV lines with a total length of 11 km; 
  • Installation of cable joints and terminations and completion of electrical connections. 

Transformer Substations:

  • Installation of ten transformer substations rated from 400 to 800 kVA; 
  • Installation and connection of 10 kV and 0.4 kV equipment; 
  • Laying and connection of power and control cables; 
  • Electrical connections and installation of grounding systems. 

10 kV Distribution Center:

  • Installation of 10 kV distribution equipment; 
  • Connection of 10 kV lines; 
  • Cable and electrical connections and installation of the grounding system. 

Testing and Commissioning:

  • Testing of the lines, transformer substations, and 10 kV distribution center equipment; 
  • Inspection of electrical connections and grounding systems; 
  • Commissioning works; 
  • Preparation of the electrical distribution system for operation.