Construction of 35/10 kV Substation, Yandakly-Agyz Village, Ahal Province, Turkmenistan
General Project Information:
The energy infrastructure of Yandakly-Agyz village includes a 35/10 kV substation equipped with two 6,300 kVA power transformers, providing a total installed capacity of 12.6 MVA.
The substation provides voltage transformation from 35 kV to 10 kV and distribution of electrical power to consumers in the area.
Location:
Ahal Province, Turkmenistan
Scope of Work:
The project included civil, electrical installation, and commissioning works at the 35/10 kV substation with a total installed capacity of 12.6 MVA.
Civil and Electrical Installation Works:
- Site preparation and construction of equipment foundations;
- Installation of two 35/10 kV, 6,300 kVA power transformers;
- Installation of 35 kV and 10 kV equipment;
- Laying and connection of power and control cables;
- Electrical connections and installation of the grounding system.
Testing and Commissioning:
- Electrical testing of the power transformers and 35/10 kV equipment;
- Inspection of cable and electrical connections and the grounding system;
- Functional testing of protection and control systems;
- Commissioning works and preparation of the substation for operation.