“Toprak” Waste Paper Recycling Plant, Ahal Province, Turkmenistan



“Toprak” Waste Paper Recycling Plant, Ahal Province, Turkmenistan

General Project Information:

The “Toprak” Plant in the Ahal Province of Turkmenistan is an industrial facility for waste paper recycling and the production of paper products. A reliable power supply system is provided to support the operation of the plant’s production and process equipment.

The power infrastructure includes a 35/0.4 kV transformer substation equipped with two 2,500 kVA power transformers, with a total installed capacity of 5,000 kVA, a 35 kV cable line, and a 35 kV overhead transmission line.

Location:

Ahal Province, Turkmenistan

Scope of Work:

The project included the supply, installation, testing, and commissioning of the plant’s 35/0.4 kV external power supply system.

35/0.4 kV Substation:

  • Supply and installation of two 2,500 kVA power transformers; 
  • Installation of 35 kV and 0.4 kV equipment; 
  • Installation of power and cable connections; 
  • Grounding of electrical equipment. 

35 kV Cable Line:

  • Preparation of the cable route and laying of the 35 kV cable; 
  • Installation and connection of the cable line; 
  • Inspection and electrical testing of the cable line. 

35 kV Overhead Transmission Line:

  • Installation works for the 35 kV overhead transmission line; 
  • Installation of poles, insulators, line fittings, and conductors; 
  • Grounding and electrical connection of the overhead line. 

Testing and Commissioning:

  • Inspection and testing of transformers and electrical equipment; 
  • Testing of the 35 kV cable line and overhead transmission line; 
  • Inspection of the grounding system; 
  • Commissioning works and verification of system readiness for operation.